A community is installing a new well in a regionally confined aquifer with a transmissivity of 1589 ft^2/d and a storatitvity of 0.00005. The planned pumping rate is 325 gal/min. There are several nearby wells tapping the same aquifer, and the project manager needs to know if the new well will cause significant interference with these wells. Required:
Compute the theoretical drawdown (h0-h) caused by the new well after 30 days (t) of continuous pumping at the following distances