kutsarver
kutsarver
28.05.2021 • 
Mathematics

10 The graph below shows the relationship between the time it takes and the number of clocks the clockmak.
the correct slope and the correct interpretation of the slope for this situation?
y
90
BO
70
60
Time (Minutes)
50
40
30
20
10
0
8 10 12 14 16 18
Clocks Assembled
A The slope is 25/4, so the clockmaker takes 6.25 minutes per clock.
B The slope is 25/4, so the clockmaker assembles 6.25 clocks per minute.
The slope is 4/25, so the clockmaker takes 6.25 minutes per clock.
The slope is 4/25, so the clockmaker assembles 6.25 clocks per minute.


10

The graph below shows the relationship between the time it takes and the number of clocks the

Solved
Show answers

Ask an AI advisor a question