giraffegurl
giraffegurl
04.12.2019 • 
Mathematics

Aconstruction engineer needs to make sure a ceiling beam is parallel to its corresponding floor beam. using the drawing as a guide, which part of the measurements are sufficient to show the beams are parallel

Solved
Show answers

Ask an AI advisor a question