he engineering department in a manufacturing plant is trying to improve the quality of the firm's product. A team has been assigned to improve drawings. The team has determined that accuracy of drawings is an important quality characteristic. To assess the department's current performance, it is collecting data on the number of errors found on the drawings that are completed each week. Prior to data collection, the team has listed all the possible errors and has given examples of each to be used by the data collectors. Which chart is appropriate? Question 17 options: 1) p chart 2) np chart 3) c chart 4) u chart 5) none of the abo