julianastri6841
julianastri6841
20.02.2020 • 
Mathematics

If C(x) = 18000 + 400x − 2.2x^2 + 0.004x^3 is the cost function and p(x) = 2800 − 7x is the demand function, find the production level that will maximize profit. (Hint: If the profit is maximized, then the marginal revenue equals the marginal cost.)

Solved
Show answers

Ask an AI advisor a question