boofpack9775
boofpack9775
12.07.2019 • 
Mathematics

Paul can install a 300-square-foot hardwood floor and 18 hours. matt can install the same floor and 22 hours. how long would it take paul and mat to install the floor working together?

Solved
Show answers

Ask an AI advisor a question