11needhelp11
11needhelp11
10.08.2021 • 
Mathematics

Six ships are docked in a harbor awaiting unloading. The times required to unload the ships are random variables with respective means of 0.6, 1.2, 2.5, 3.5, 0.4, and 1.8 hours. The ships are given a priority weighting based on tonnage. The respective tonnages are 12, 18, 9, 14, 4, and 10. In what Nahmias, Steven; Olsen, Tava Lennon. Production and Operations Analytics (p. 685). Kindle Edition.

Solved
Show answers

Ask an AI advisor a question