dbryrob2557
dbryrob2557
23.10.2019 • 
Physics

Apitcher throws a 0.140 kg baseball, and it approaches the bat at a speed of 35.0 m/s. the bat does wnc = 75.0 j of work on the ball in hitting it. ignoring air resistance, determine the speed of the ball after the ball leaves the bat and is 25.0 m above the point of impact.(answer in m/s)

Solved
Show answers

Ask an AI advisor a question