A water bottle manufacturer plant uses a three-step procedure to produce each unit of bottled water. The first step, casting, which uses 35 labor hours to operate the furnace. The second step, quenching, which uses 35 labor hours, and the final step, dispatch, uses 70 labor hours. If the factory produces 14,000 bottles, than the productivity of labor is equal to: