emmie50
emmie50
26.09.2019 • 
Business

Amanual assembly line must be designed for a product with annual demand of 150,000 units. the line will operate 50 wk/yr, 10 shifts/wk, and 7.5 hr/shift. work units will be attached to a continuously moving conveyor. work content time is 58.0 min. assume line efficiency is 0.95, balancing efficiency is 0.93, and repositioning time is 8 sec. determine the actual number of workers required.

Solved
Show answers

Ask an AI advisor a question