montgomerykarloxc24x
06.04.2021 •
Business
Answer the question based on the following balance sheet for the First National Bank. Assume the reserve ratio is 15 percent: Refer to the above data. If the balance sheet was for the whole commercial banking system rather than a single bank, then loans and deposits could expand by a maximum of approximately: Select one: a. $120,000 b. $213,333 c. $333,500 d. $415,373
Solved
Show answers
More tips
- W Work and Career How much does an honest traffic police officer earn in a day?...
- G Goods and services How to sew a ribbon: Tips for beginners...
- L Leisure and Entertainment How to Learn to Draw Graffiti: Tips for Beginners...
- F Family and Home How to Remove Tar Stains: Tips and Recommendations from Experts...
- F Family and Home How to Remove Fading from Clothes: Tips and Tricks...
- S Sport How to Do a Jumping Split...
- H Health and Medicine How Did Inna Lose Weight on Dom 2?...
- F Family and Home How to Properly Fold Napkins in a Napkin Holder?...
- F Food and Cooking How to Set Up Ventrilo - The Ultimate Guide...
- S Science and Technology How to Make a Homemade Smoker: The Ultimate Guide...
Answers on questions: Business
- M Mathematics In addition to the party hats and horns, lana also bought 3 bags of whistles with 18 whistles in each bag when the party started, lena found that 19 out of the total number of party...
- M Mathematics A right triangle has a base of 5 and a height of 8 , what is the area of the triangle?...
Ответ:
a. 2.13. b. (30.53, 34.79). c. The mean prices for two in mid-range restaurants in Hong Kong are relatively less than those in Tokyo restaurants.
Explanation:
The size of the sample is 42 and the mean of the sample is ∑ = 32.66 and the standard deviation of the sample (σ) is √[∑(-μ)^2 - 1] = √46.6092 = 6.8271
a. α = 1 - (95/100) = 0.05; α/2 = 0.025; the degree of freedom = n-1 = 42-1 = 41; tα/2 = t0.025 = 2.02. Thus, the error margin = (tα/2)*(σ/√n) = 2.02*(6.83/√42) = 2.1279
b. Lower level limit = 32.66 - 2.1279 = 30.5321; Upper level limit = 32.66+2.1279 = 34.7879. The interval estimate = (mean± margin of error) = (30.53, 34.79).
c. The mean prices for two in mid-range restaurants in Hong Kong are relatively less than those in Tokyo restaurants.