NickCamryn5472
NickCamryn5472
08.09.2021 • 
Business

Assembly line in a car assembly plant is scheduled to be available for 10.5 hours of production each day. The actual operating time each day has been found to be on average 8 hours after taking into consideration unplanned downtime incidents. Each day an average of 500 cars is produced by the assembly line, but due to the process capability of the equipment (on the assembly line) an average of 100 cars are found to be defective each day. The assembly line was designed to produce at a rate of 75 cars per hour when operational. Determine the following:

a. Availability Performance
b. Quality Overall Equipment
c. Effectiveness

Solved
Show answers

Ask an AI advisor a question