therealpr1metime45
therealpr1metime45
09.09.2019 • 
Business

In a normal costing system, the cost of a job includes
a. actual direct materials, actual direct labor, and estimated (applied) overhead.
b. estimated direct materials, estimated direct labor, and estimated overhead.
c. actual direct materials, actual direct labor, actual overhead, and actual selling cost.
d. actual direct materials, actual direct labor, and actual overhead.
e. none of these. job-order costing requires the use of actual, not normal, costing.

Solved
Show answers

Ask an AI advisor a question