Yanmei Construction Company began operations on January 1, 2020. During the year, Yanmei Construction entered into a contract with Lundquist Corp. to construct a manufacturing facility. At that time, Yanmei estimated that it would take 5 years to complete the facility at a total cost of $4,500,000. The total contract price for construction of the facility is $6,000,000. During the year, Yanmei incurred $1,185,800 in construction costs related to the construction project. The estimated cost to complete the contract is $4,204,200. Lundquist Corp. was billed and paid 25% of the contract price.
Instructions:
Prepare schedules to compute the amount of gross profit to be recognized for the year ended December 31, 2020, and the amount to be shown as "costs and recognized profit in excess of billings" or "billings in excess of costs and recognized profit" at December 31, 2020, under each of the following methods. Show supporting computations in good form.
a. Completed-contract method.
b. Percentage-of-completion method.
Solved
Show answers
More tips
- F Food and Cooking How to Make Lazy Cabbage Rolls? Simple Steps to a Delicious Dish...
- F Food and Cooking Unusually Delicious Shashlik - Follow the Etiquette of Proper Preparation!...
- L Leisure and Entertainment Couchsurfing: A New Way to Travel...
- G Goods and services Which TV is better - LCD or Plasma?...
- S Sport How to Learn to Pull Up on Monkey Bars?...
- L Leisure and Entertainment Scrapbooking: What is it and Why is it Becoming More Popular?...
- C Computers and Internet Where did torrents.ru move to?...
- B Business and Finance Understanding Cash Flow: What It Is and How It Works...
- C Computers and Internet What Are Peers and Seeds in Torrenting?...
- H Health and Medicine 10 Simple Techniques on How to Boost Your Mood...
Answers on questions: Business
- B Business Assume that the building the company wants to build is a manufacturing plant and that it was going to be built in a semi-residential neighborhood. Owners of the surrounding property...
- B Business Compute the payback statistic for Project B if the appropriate cost of capital is 10 percent and the maximum allowable payback period is three years. (If the project never pays...
- B Business Bryan Houlberg expects his C corporation to generate a profit of $200,000. What is Bryan s after-tax cash flow from the corporation if net income after corporate tax is distributed...
- B Business A condition where people tend to perceive themselves in terms of their class background and this shapes their relationships with members of other classes is known as...
- B Business Based on your analysis of Q2, what is your view on the foreign exchange hedging strategy and the hedging instruments chosen by Porsche? If you were Porsche’s CEO, would you implement...
- B Business Patrick has $12,000 saved for medical school from gifts and summer jobs. Because the cost of college has risen each year, Patrick knows he needs a savings account that will help...
- B Business Cayuga Hardwoods produces handcrafted jewelry boxes. A standard-size box requires 8 board feet of hardwood in the finished product. In addition, 2 board feet of scrap lumber are...
- B Business The First Amendment: a. does not afford protection for corporate political speech. b. does not permit regulation of corporate advertising. c. provides limited protection for corporate...
- B Business After carefully considering the most recent employee survey results, you decide that Applebee s core issue is that employees feel that they have no control over how they do their...
- B Business Helix Corporation produces prefabricated flooring in a series of steps carried out in production departments. All of the material that is used in the first production department...
Ответ:
Yanmei Construction Company
Gross profit for December 31, 2020:
Completed Contract Percentage of Completion
Revenue recognized $1,500,000 $1,320,000
($1,185,800/$5,390,000 * $6,000,000)
Costs incurred $1,185,800 $1,185,800
Gross profit $314,200 $134,200
Costs and recognized profit in excess of billings
Total billing in 2020 $1,500,000 $1,500,000
Costs incurred $1,185,800 $1,185,800
Recognized profit $314,200 $134,200
Total costs + profit $1,500,000 $1,320,000
Excess of billings $0 ($180,000)
Explanation:
a) Data and Calculations:
Estimated contract completion period = 5 years
Estimated total cost of completion = $4,500,000
Total contract price = $6,000,000
Construction costs incurred during the year = $1,185,800
Estimated cost to complete the contract = $4,204,200
Total costs to be incurred = $5,390,000
Billing = $1,500,000 (25% of $6,000,000)
Ответ:
i. 170 m
ii. 850 m
Explanation:
Question
Arjun and his son Arav were standing ‘x’ m away from each other. They are equidistant (Y m) from a vertical cliff. Arjun burst a balloon and Arav heard the direct sound 0.5 seconds later and the echo after 2 seconds. If the speed of sound in air is 340m/s ,calculate
i. the distance between Arjun and Arav
ii. the distance between the cliff and Arjun
The parameters given are;
The time for the sound to reach Arav, = 0.5 s
Time for the echo to echo to reach Arav, = 2 s
The distance between Arjun and Arav =
The distance between Arav and the cliff =
The speed of sound in air, s = 340 m/s
The formula for speed, s, is , therefore;
= 0.5 s × 340 m/s = 170 m
The distance between Arjun and Arav = 170 m
ii. Since Arav hears the direct sound before the echo, he is closer to the cliff than Arjun, therefore, we have;
= 2 s × 340 m/s = 680 m
Therefore, the distance between Arav and the cliff = 680 m
Which gives the distance between the cliff and Arjun, = The distance between Arav and the cliff + The distance between Arjun and Arav
= 680 + 170 = 850 m.