biancaTomas010B
biancaTomas010B
25.09.2020 • 
Engineering

Consider two machines with two different instruction sets. Machine A has a 2 GHz clock, and machine B has a 4 GHz clock. The following measurements are recorded upon execution of a program. Machine A Instruction Class
Arithmetic Load/Store Branch
Instruction Count (millions) 10 4 6
CPI 2 3 1
Machine B Instruction Class
Arithmetic Load/Store Branch
Instruction Count (millions) 14 5 8
CPI 2 8 1
For Machine A, what is the average CPI and execution time?
For Machine B, what is the average CPI and execution time?

Solved
Show answers

Ask an AI advisor a question