juliannabartra
juliannabartra
20.07.2021 • 
Mathematics

A construction crane lifts a bucket of sand originally weighing 145 lbs at a constant rate. Sand is lost from the bucket at a constant rate of .5lbs/ft. How much work is done in lifting the sand 80ft?

Solved
Show answers

Ask an AI advisor a question