Acarpenter contracts to do a job. the costs for the job are $2000 for materials, $500 for labor, and $150 for equipment rental. what would be the total cost of materials were increased by 15%
Solved
Show answers
More tips
Answers on questions: Mathematics
- M Mathematics Connor is using a computer program to graph the function h(n)= -13n - 421. he wants to see the intercepts. which minimum values should he use to set up the viewing...
- M Mathematics Josie s hair currently falls about 16 centimeters (\text{cm})(cm)left parenthesis, start text, c, m, end text, right parenthesis below her shoulder and grows about...
- M Mathematics Which expression is equivalent to ³✓x⁵y? •x⁵/³y• x⁵/³y⅓ •x⅗y •x⅗y³...
- M Mathematics Pls stop flagging me I just need help...
- M Mathematics You can multiply 20 × 3.46 by taking apart 3.46, multiplying each part by 20, and then adding the products. Which equation shows this method?...
- M Mathematics 6- Nov 19 P1 # Solve, using algebra, the equation x-6x^1/2 + 4 = 0 Fully simplify your answers, writing them in the for a +bsqrroot c where a, b and c are integers...
- M Mathematics You are using a 0.5-gallon pitcher to make smoothies. You fill 0.3 of the pitcher with milk.How many gallons of milk did you use?...
- M Mathematics Show Workings.Question is in attached image....
- M Mathematics What are all the solutions (in exact values) to tan x = 1/4 [-π,π] ?...
- M Mathematics (6.51 x 10^4) - (3.26 x 10^4)...
Ответ:
$2950
Step-by-step explanation:
Add together the following three items:
Materials: $2000 plus 15%, or 1.15($2000), or $2300
Labor: $500
Equipment Rental: $150
Total: $2300 + $500 + $150 = $2950