alonnachambon
alonnachambon
17.07.2019 • 
Mathematics

If 4/7 ton of concrete covers 7/8 of a bridge, how many tons of concrete are required to cover the entire bridge? 17/56 ton 3/7 ton 1/2 ton 32/49 ton me out : p

Solved
Show answers

Ask an AI advisor a question