mvasquez3122p4vahv
mvasquez3122p4vahv
28.02.2020 • 
Mathematics

Six machines at a certain factory operate at the same constant rate. If four of these machines, operating simultaneously, take 27 hours to fill a certain production order, how many fewer hours does it take all six machines, operating simultaneously, to fill the same production order?A: 9B: 12C: 16D: 18E: 24

Solved
Show answers

Ask an AI advisor a question