![kale2158](/avatars/46271.jpg)
kale2158
23.01.2020 •
Mathematics
Working alone, it would take shandra 40 minutes to sand a table. to sand the same table, also working alone, it would take kelly 1 hour. if they work together, the situation can be modeled by the following equation, where t is the time it would take to sand the table working together.

shandra claims it will take them about 50 minutes working together, because 50 is the mean of 40 and 60. which best describes shandra’s claim?
shandra’s claim is correct.
shandra’s estimate is too high because she should have found the differences instead of the mean.
shandra’s estimate is too high because it will take them about 24 minutes.
shandra’s estimate is too low because it will take them about 100 minutes.
Solved
Show answers
More tips
- C Computers and Internet How Do You Refill Cartridges?...
- F Family and Home How to Keep Your Home Warm: Tips and Tricks...
- D Dating, Love, Relationships Does a Person s Character Depend on the Color of Their Eyes?...
- O Other Childhood Fears: What Many of Us Experienced...
- H Health and Medicine Simple and Effective: How to Get Rid of Cracked Heels...
- O Other How to Choose the Best Answer to Your Question on The Grand Question ?...
- L Leisure and Entertainment History of International Women s Day: When Did the Celebration of March 8th Begin?...
- S Style and Beauty Intimate Haircut: The Reasons, Popularity, and Risks...
- A Art and Culture When Will Eurovision 2011 Take Place?...
- S Style and Beauty How to Choose the Perfect Hair Straightener?...
Answers on questions: Mathematics
- M Mathematics 2 3 4 5 6 00 11 What is the interest rate 159900?...
- M Mathematics Give one pair of supplementary angles and one pair of vertical angles shown in the figure below. 12 (a) Supplementary angles: 21 and 21 4 3 (b) Vertical angles: 21 and 20 56 m...
- M Mathematics The trough in the illustration has a cross-sectional area of 51 square Inches. Find the depth, d, of the trough. (Hint: Area of a trapezoid - MD, + b33). d- 12 in...
- M Mathematics I don’t get it what does he mean plz explain...
- M Mathematics Adam earns $13.72 each hour that he works.He work 9 hours each week how much does adam earn each week...
- M Mathematics Lydia makes $7,000 per month in New York City at her interior design company. She can t spend more than 25% of her income on the one bedroom apartment she s looking for...
- M Mathematics A circular pizza with a diameter of 8 inches. The pizza is in a square box with side lengths of 8 inches. In square inches, how much of the box is empty? Use π = 3.14 and round...
- M Mathematics U so mad mod mod come at me why u ban me...
- M Mathematics Guess my favorite show will give brainliest hint:upper east side...
- M Mathematics The ratio of two numbers is 2:7. the product of these numbers is 224. what is the smaller of these two numbers...
Ответ:
Step-by-step explanation:
Shandra needs 40 minutes to complete to sand the table.
In 1 minute, Shandra completes
part of the work.
Similarly, Kelly takes 1 hour, that is 60 minutes to complete to complete the work.
In 1 minute, Kelly completes
part of the work.
In 1 minute, they together completes
part of the work.
Hence,
part of the work takes 1 minute to complete.
The whole work will be completed in
= 2 minute 24 seconds.
Shandra’s estimate is too high because it will take them about 2 minutes 24 seconds.
Ответ:
Shandra’s estimate is too high because it will take them about 24 minutes.
Step-by-step explanation: Edg 2020
Ответ:
Total number of T-shirts= 200
Cost per T-shirt (without shipping ) = $2.80
Shipping cost per t-shirt ; 5% of a T-shirt = 0.05 *2.80 = $0.14
Total cost of T-shirt (shipping included) = 2.80 +0.14 = $2.94
Markup = 150% of total cost = 1.50 * 2.94 = $4.41
To get the price at which Michelle will sell each T-shirt , add total cost to the markup; 2.94 +4.41 = 7.35.
Therefore, selling price will be $7.35