angel13sigala
20.05.2021 •
Business
A job cost sheet of Sandoval Company is given below.
Job Cost Sheet
JOB NO. 469 Quantity 2,500
ITEM White Lion Cages Date Requested 7/2
FOR Todd Company Date Completed 7/31
Date Direct Direct Labor Manufacturing
Materials Labor Overhead
7/10 700
12 900
15 440 550
22 380 475
24 1,600
27 1,500
31 540 675
Cost of completed job:
Direct materials
Direct labor
Manufacturing overhead
Total cost
Unit cost
(1) What are the source documents for direct materials, direct labor, and manufacturing overhead costs assigned to this job?
Source Documents
Direct materials pixel.gifMaterials requisition slipsPredetermined overhead rateTime tickets
Direct labor pixel.gifMaterials requisition slipsPredetermined overhead rateTime tickets
Manufacturing overhead pixel.gifMaterials requisition slipsPredetermined overhead rateTime tickets
(2) What is the predetermined manufacturing overhead rate? (Round answer to 0 decimal places e.g 135.)
Predetermined manufacturing overhead rate pixel.gif %
(3) What are the total cost and the unit cost of the completed job? (Round unit cost to 2 decimal places, e.g. 1.25.)
Total cost of the completed job $pixel.gif
Unit cost of the completed job $pixel.gif
Solved
Show answers
More tips
- H Health and Medicine Heartburn: Causes and Ways to Get Rid of It...
- H Health and Medicine Simple and Effective: How to Get Rid of Cracked Heels...
- H Health and Medicine Relieving Swelling in Legs: Causes and Ways to Alleviate the Symptom...
- W Work and Career Мерчендайзинг – все, что нужно знать...
- O Other Everything You Need to Know About Kudyabliks...
- F Food and Cooking How to cook crayfish? Everything you need to know...
- F Food and Cooking Homemade kvass: recipe and brewing process...
- H Health and Medicine How to Choose the Right Tanning Cream?...
- S Style and Beauty Secrets of Tying a Pareo: 5 Ways...
- S Sport Running: How to Do It Right?...
Answers on questions: Business
- M Mathematics The graph shows the amount of garbage produced in the US each year between 1991 and 2013. Did the amount of garbage increase or decrease between 1999 and 2000?...
- M Mathematics Let T be a linear transformation from R^3 to R^3 Determine whether or not T is one-to-one in each of the following situations:. 1. Suppose T(0, -2, -4) = u.T(-3,-4,1)...
- B Biology Which of the following is the correct term for diseases that are transmittable from animals to humans? a. brucellosis b. cystitis c. leptospirosis d. zoonosis...
- M Mathematics D (4, What is the equation, in point-slope form, of the line that is perpendicular to the given line and passes through the point (-4, 3)? O y-3 = -2(x + 4) Oy-3...
Ответ:
A. Direct materials-Materials requisition slips
Direct labor-Time tickets
Manufacturing overhead- Predetermined overhead rate
B. 125%
C. Total cost $7,760
Unit cost $3.104
Explanation:
1. Based on the information given the source documents for direct materials, direct labor, and manufacturing overhead costs assigned to this job are :
Direct materials-Materials requisition slips
Direct labor-Time tickets
Manufacturing overhead- Predetermined overhead rate
2. Calculation to determine the predetermined manufacturing overhead rate
Predetermined overhead rate=$550/$440*100
Predetermined overhead rate=125%
Therefore the predetermined manufacturing overhead rate is 125%
3. Calculation to determine the total cost and the unit cost of the completed job
TOTAL COST
Direct Material $4, 700
($700 + $900 + $1,600 + $1,500)
Add Direct Labor $1,360
($440 + $380 + $540)
Add Manufacturing Overhead $1,700
($550 + $475 + $675)
Total Cost $7,760
UNIT COST
Unit cost= $7,760/ 2,500
Unit cost=$3.104
Therefore the total cost is $7,760 and the unit cost of the completed job is $3.104
Ответ:
During the control function, the measurements taken of the performance must be accurate enough to see "deviations and variances".
Option: B
Explanation:
One object of control charts is to calculate a process's average and standard deviation. Control functions or two-stage residual inclusion are statistical methods for resolving problems with endogeneity by modeling the endogeneity in the context of error.
A specific reason behind the commonness is they function for non-invertible models like discrete choice models and allow heterogeneous effects, whereby consequences at the individual level will vary from aggregate effects. The control chart analysis shows that the procedure is actually under control, and then no improvements or adjustments to the control systems parameters are necessary or needed.