sjsmith21
sjsmith21
14.02.2020 • 
Business

Flag this Question Question 76.25 pts The Happy Cakes Cupcake Factory produces sweet treats using a 6-meter machine-paced conveyor assembly line with six workers placed along it. Each of the six stations performs a different task and at any time, the line has six units of product on it, spaced approximately evenly so that each of the six workers can be working on one of the items. These workers are paid $12/hour for the normal 7 hours that they work on the line each day, with a 50% premium for any overtime work (time-and-a-half). The daily demand for the product being assembled on this line is 2.9 thousand units; this demand is stable. Assume the line must operate at a constant pace, since it is a conveyor belt. 13 sec 4 sec 6 sec 3 sec 6 sec 4 sec What is the current maximum speed in meters per minute that the conveyor belt can run? Please enter your answer rounding to two decimal places (Example: 6.749 would be 6.75).

Solved
Show answers

Ask an AI advisor a question