Activity Immediate Predecessor Optimistic Most Likely Pessimistic Sigma Variance A - 2 3 4 0.333 0.111 B - 2 5 8 1 1 C A 1 2 9 1.33 1.78 D A 5 5 5 0 0 E B, C 6 7 8 0.333 0.111 F B 14 14 14 0 0 G D, E 1 5 9 1.333 1.78 H G, F 1 4 8 1.67 1.362 If the normal distribution were used to find the probability of finishing this project in 24 weeks or fewer, what mean and standard deviation would be used