![ashquinn](/avatars/22072.jpg)
ashquinn
15.08.2021 •
Mathematics
How to solve these? I would like explanation please
Solved
Show answers
More tips
- F Food and Cooking How to Cook Julienne? Recipes and Tips...
- D Dating, Love, Relationships 10 Useful Tips on How to Survive a Breakup?...
- F Food and Cooking Apple Cider Vinegar: The Ultimate Health and Beauty Solution...
- C Computers and Internet Е-head: How it Simplifies Life for Users?...
- F Family and Home How to Choose the Best Diapers for Your Baby?...
- F Family and Home Parquet or laminate, which is better?...
- L Leisure and Entertainment How to Properly Wind Fishing Line onto a Reel?...
- L Leisure and Entertainment How to Make a Paper Boat in Simple Steps...
- T Travel and tourism Maldives Adventures: What is the Best Season to Visit the Luxurious Beaches?...
- H Health and Medicine Kinesiology: What is it and How Does it Work?...
Answers on questions: Mathematics
- M Mathematics Each friend received 5/4 of a pound of berries, how many friends are sharing berries?...
- M Mathematics A 5.8-ft-tall person walks away from a 9-ft lamppost at a constant rate of 3.4 ft/sec. What is the rate that the tip of the person s shadow moves away from the lamppost...
- M Mathematics Pleass im about to cry...
- M Mathematics What is the value of 2x + 2(xy-z) where x=3, y=4 and z=-1...
- M Mathematics Solve the equation by factoring 2x^2+x-6=0...
- M Mathematics Please help me 1-5 additional practice conditional statements....
- M Mathematics tell me what dogs for 2 weeks the first week she earned $5.75 the second week she earn $12.50 how much money did TV earn the second week then the first week...
- M Mathematics one year, a school USES 11.470 pieces of white paper, 3,970 fewer pieces of blue paper than white paper, and 3,200 fewer pieces of yellow paper than blue paper. How many...
- M Mathematics For a continuous random variable X, P(23 ≤ X ≤ 66) = 0.25 and P(X 66) = 0.14. Calculate the following probabilities. (Leave no cells blank - be certain to enter 0 wherever...
- M Mathematics A population has mean and standard deviation . Find and for samples of size . Round your answers to one decimal place if needed....
Ответ:
Step-by-step explanation:
9.
it is a rectangle. 18m × 4m = 72 m²
the paving costs $35 per m², and we have 72 m², so it does not take a genius to figure out what to do next ...
right : we multiply 35 by 72
35×72 = $2520
10.
how much volume is a liter ?
a liter fits into a cube of 10cm side length.
and 1 meter = 100 cm = 10×10cm.
so, 1 m³ = 10×10×10 = 1000 such cubes of 10cm side length = 1000 liters.
the pool is 5 m × 15 m × 1.5 m = 112.5 m³ = 112500 liters
we need 2 kg salt for every 10000 liters water, so we have how many units of 10000 liters in the pool ?
112500 / 10000 = 11.25
so, we need
11.25 × 2 = 22.5 kg salt
11.
12 seconds = 1/5 of a minute.
so, batman runs at 3 km / min (= 60×3 km/hour = 180 km/h - not possible in real life for any human being, but let's play ...) for 12 seconds = 1/5th of a minute, and so he runs 3km/5 = 600 meters in that time.
that means he has 2km - 600m = 1400m left to run in the 2 km race.
it takes him 1400/3000th of a minute (3000 m would take him the full minute)
1400 m × minute / 3000 m = 14/30 = 7/15 minutes
1/15th minute = 60 seconds / 15 = 4 seconds.
so, 7/15th of a minute = 7×4 seconds = 28 seconds.
the bionic woman runs the full 2000 m with 5 km / minute.
it takes her 2000/5000th of a minute
2000 m × minute / 5000 = 2/5th of a minute.
1/5th of a minute is 60 seconds / 5 = 12 seconds.
so, 2/5th of a minute is 12×2 = 24 seconds.
therefore, the bionic woman wins by 4 seconds (24 seconds vs. 28 seconds).
12.
there is enough food for 150 students for 5 days = 150×5 =750 "food units".
therefore, if there were only 100 students, the food would last 750/100 = 7.5 days.
and if the food runs out after 4 days it means there are
750/4 = 187.5 students (how much sense that makes to have half a student ...).
13.
x = the workload to be done
Michelle's work speed is x/6 days
Danielle's work speed is x/4 days
on each day working together they achieve
1× x/6 + 1× x/4 of the total work load.
that is
2x/12 + 3x/12 = 5x/12
so, they need 5x/12 × a days to finish the whole x.
5x/12 × a = x
5/12 × a = 1
5a = 12
a = 12/5 = 2.4 days to finish the whole work when working together.
Ответ:
Hope this helps!!!:)
Have a great day