![alizeleach0123](/avatars/23440.jpg)
alizeleach0123
07.07.2021 •
Mathematics
Small Manufacturing Company has a standard overhead rate of $42 per hour. The labor rate is $20 per hour. Overhead is applied based on direct labor hours. Jobs B-1 and B-2 were completed during the month of March. Small incurred 140 hours of indirect labor during the month
Solved
Show answers
More tips
- F Family and Home How to Choose a Name for Your Baby?...
- B Business and Finance How to Open an Online Store? A Detailed Guide for Beginners...
- W Work and Career How to Write a Resume That Catches the Employer s Attention?...
- C Computers and Internet Е-head: How it Simplifies Life for Users?...
- F Family and Home How to Choose the Best Diapers for Your Baby?...
- F Family and Home Parquet or laminate, which is better?...
- L Leisure and Entertainment How to Properly Wind Fishing Line onto a Reel?...
- L Leisure and Entertainment How to Make a Paper Boat in Simple Steps...
- T Travel and tourism Maldives Adventures: What is the Best Season to Visit the Luxurious Beaches?...
- H Health and Medicine Kinesiology: What is it and How Does it Work?...
Answers on questions: Mathematics
- M Mathematics ~Brainliest to best answer~ A polling company said that the percent of people who will vote for Candidate A is likely between 38.6% and 45.4%. How many people were surveyed?...
- M Mathematics If AC = 10 and BD = 18 in rhombus ABCD, determine the following angles measures to the nearest tenth of a degree DAB ADC...
- M Mathematics How do you work this problem 2.5÷ 4...
- S Social Studies Why did all the Wars happen with the U.S...
- C Chemistry What is the chemical equation for cacl2 dissolved in water?...
Ответ:
The question is incomplete. The complete question is :
Small Manufacturing Company has a standard overhead rate of $42 per hour. The labor rate is $15 per hour. Overhead is applied based on direct labor hours. Jobs B-1 and B-2 were completed during the month of March. Small incurred 140 hours of indirect labor during the month. Job B-1 used 82 direct labor hours and $3650 worth of direct material used. Job B-2 used 130 direct labor hours and $2,900 worth of direct material. What is the total cost of job B-2? Round to closest whole dollar (no cents).
Solution :
Particulars Job B-2
Direct material used $ 2,900
Add : Direct labor cost (130 hours x $15) $ 1,950
Add : overhead cost (130 hours x $ 42) $ 5,460
Total Cost of Job B-2 $ 10,310
Therefore, the total cost of the Job B-2 is $ 10,310.