A local mattress manufacturer wants to know if its manufacturing process is in or out of control and has hired you, a statistics expert in the field, to analyze its process. Specifically, the business has run 20 random samples of size 5 over the past month and has determined the mean of each sample.
Sample Mean of Sample
1 95.72
2 95.44
3 95.4
4 95.5
5 95.56
6 95.72
7 95.6
8 95.24
9 95.46
10 95.44
11 95.8
12 95.2
13 94.82
14 95.78
15 95.18
16 95.32
17 95.08
18 95.22
19 95.04
20 95.48
Required:
a. Determine the estimate of the mean when the process is in control.
b. Assuming the process standard deviation is 0.50 and the mean of the process is the estimate calculated in part a , determine the Upper Control Limit (UCL) and the Lower Control Limit (LCL) for the manufacturing process.
c. Explain the results to the vice-president of the mattress manufacturer focusing on whether, based on the results, the process is in or out of control.
Solved
Show answers
More tips
- H Horoscopes, Magic, Divination Is there a 13th Zodiac Sign?...
- H Health and Medicine Want to Lose Weight? Gain Muscle without Damaging Your Health!...
- F Family and Home Parquet or laminate, which is better?...
- L Leisure and Entertainment How to Properly Wind Fishing Line onto a Reel?...
- L Leisure and Entertainment How to Make a Paper Boat in Simple Steps...
- T Travel and tourism Maldives Adventures: What is the Best Season to Visit the Luxurious Beaches?...
- H Health and Medicine Kinesiology: What is it and How Does it Work?...
- O Other How to Choose the Best Answer to Your Question on The Grand Question ?...
- L Leisure and Entertainment History of International Women s Day: When Did the Celebration of March 8th Begin?...
- S Style and Beauty Intimate Haircut: The Reasons, Popularity, and Risks...
Answers on questions: Mathematics
- M Mathematics Which value of p is the solution of 5p - 1 = 2p +20? 1) 19/72) 19/33) 34) 7...
- P Physics On a planet far, far ay, an astronut picks up a rock the rock has a mass of 5.00 kg and on this particular planet its weight is 400n. if the astronaut erts an upward force...
- H Health Which of the following defines scoliosis? a. a posture disorder characterized by the shoulders being rounded and the back hunched b. a posture disorder in which the spine...
- P Physics An 84% efficient single pulley is used to lift a 230 kg piano 3.5 m. How much work must be input?...
Ответ:
a. 95.4
b. UCL = 96.07
LCL = 94.73
c. Process is in control
Step-by-step explanation:
a. The computation of estimate mean is shown below:-
= 95.4
b. The computation of Upper Control Limit (UCL) and the Lower Control Limit (LCL) for the manufacturing process is shown below:-
= 95.4 + 0.67082
= 96.07
= 95.4 - 0.67082
= 94.73
c. The explanation is shown below:-
From the above calculation we can see that the sample lies between LCL AND UCL that is (94.73 ,96.07) ,
The Process is in control
Ответ:
a) 33.33%)
b) 135 minutes
c) 8.66 min
d) 50%
Step-by-step explanation:
a) the probability for a uniform distribution is
P(b<X<a) = (a-b)/(c-d) , where c and d are the maximum and minimum values
therefore the probability that the flight is more than 140 minutes ( and less than 150 since it is the maximum value)
P(140<X<150) = (a-b)/(c-d) = (150-140)/(150-120) = 10/30 = 1/3 (33.33%)
b) the mean (expected value) for a uniform probability distribution is
E(X) = (c+d)/2 = (120+150)/2 = 135 minutes
c) the standard deviation for a uniform probability distribution is
σ²(X)= (c-d)²/12 = (150-120)²/12 = 75 min²
σ = √75 min² = 8.66 min
b) following the same procedure as in a)
P(120<X<135) = (a-b)/(c-d) = (135-120)/(150-120) = 15/30 = 1/2 (50%)